The Crystal City Drawings We Reviewed for Jordan’s Dead Sea

On February 22, 2011, my father, Munir Zaabri, and I sent an architect two PDFs from Jordan. My uncle Naim was involved with Crystal City Tourism Investment Co. The question we put to Joe Lancor was whether there was still time to bring a fresh proposal to a family resort on the Dead Sea. A visitor needed to be able to move between a hotel, residences, a spa and a water park on a steep shoreline. We wanted to know what an architect would do with that ground.

What Cuningham drew

The twelve-page study in my files is dated September 9, 2010. Its cover credits Cuningham Group Architecture in Minneapolis and identifies Omnix Group as the recipient. Inside, the scheme is called Crystalus Resort & Residence Club. Page five pairs an overhead plan with a section through the slope. The section makes something clear that is harder to see from above: visitors would descend a series of terraces on their way to the water. Later sheets explore daylight, screening and the pool area.

Hand-drawn section showing terraces stepping from the hotel toward the Dead Sea.
Detail of the site section on page 5 of Cuningham Group Architecture’s September 2010 study. The Dead Sea is at the right edge.

The other attachment was a May 2010 master-plan sheet credited to maisam architects & engineers. The drawing labels four aqua-park terraces at different elevations and gives the shoreline promenade a width of six metres. Read beside Cuningham’s section, it shows why getting from the hotel to the water was a design question. Find Crystal City in maisam’s planning portfolio (PDF, page 13). View Chapman Taylor’s separately credited masterplan concept and renderings.

Four aqua-park areas marked at different elevations on maisam’s Crystal City master plan.
Detail of the four aqua-park areas on the May 2010 Crystal City master-plan sheet. Drawing credit: maisam architects & engineers.

Inside the Dead Sea design study

Hand-drawn architectural study of daylight and screening at the proposed Dead Sea resort.
Cuningham Group Architecture’s daylight study, page 8 of the September 2010 Crystalus study circulated to the design team in February 2011. The PDF also includes the waterfront detail from maisam’s separate master-plan sheet.

View the Cuningham daylight study and maisam waterfront drawing (PDF)

See Crystal City in architect Ahmad Tayeh’s project credits in maisam’s portfolio.

What happened after we sent the plans

On February 24, I asked Joe Lancor how quickly he could put an alternative proposal together. He had reviewed the Cuningham study and site map with Mike Woods. His estimate was three weeks for a color site plan, three-dimensional views and a written explanation. One idea was a restaurant cantilevered over the cliff. I clarified that the brief was for a family resort and coordinated follow-up with my uncle. That exchange records the work I did on the design brief and the scope Lancor proposed.

Download the Cuningham and maisam drawings exhibit (one-page PDF) · Open Chapman Taylor’s illustrated project sheet (PDF).

Scroll to Top